DescriptionThis document is one of four planning notebooks, corresponding to the four basin committees of the Policy Advisory Committee (PAC). Each basin committee has primary responsibility for developing a...
DescriptionThis summary evaluation is presented to provide the reader with a basis for comparison of alternatives and control measures. This report is a companion volume for the report entitled Water Quality...
DescriptionThis document is one of four planning notebooks, corresponding to the four basin committees of the Policy Advisory Committee (PAC). Each basin committee has primary responsibility for developing a...
DescriptionEight Middlesex County impoundments were sampled four times from October 1975 through August 1977. In general, these impoundments show characteristics typical of small, shallow lakes that drain large...
DescriptionThe report is organized to discuss the 1976 low flow surveys under the
following headings:
Chapter I - Introduction
Chapter II - Program Outline
Chapter III- Discussion
Chapter IV - Summary
The...
DescriptionThis document compiles comments received at the September 8, 1977 public hearing on the 208 Water Quality Management Plan Alternatives Report. The comments generally expressed confidence in the 208...
DescriptionThe Task 5 modeling report contained a description of the application of a model previously developed by Lawler, Matusky and Skelly Engineers (LMS) and subsequently modified, to the Upper and Lower...
DescriptionThe primary objectives of this part of the Middlesex 208 study are:
1. to identify, where practicable to do so within the availability of existing information, the sources of hazardous, toxic and...
DescriptionThis report consists of five sections: 1- an introduction; 2- parameter evaluation of the river systems, oxygen-demanding waste loads, point sources of oxygen, and response characteristics of the...